MIL-R-25410G
d. Quality conformance verification inspection. Quality
conformance verification inspection shall consist of examinations and tests
performed on individual products or lots to determine conformance of the
products or lots with the requirements specified in this specification
(see 4.6}.
4.3 Qualification inspection. Qualification inspection shall consist
of the examinations and tests specified in Table V, listed sequence
mandatory.
4.3.1 Qualification samples.
Qualification samples shall consist of
the following:
a. Two regulators of the part number for which qualification
testing has been requested and authorized.
b. Six elastomer test slabs, 6 X 6 X 0.075 inches, composed of the
identical ozone-resistance composition and cure that was used in
manufacturing the samples.
c. Two sets of manufacturer's drawings as set forth in the
provisions and terms of SD-6.
d. Wen applicable, certification from the original manufacturer,
that the distributor requesting qualification status is authorized to
distribute the item, or to rebrand and distribute the item.
Samples shall be forwarded to the test facility set forth in the
letter of authorization to submit samples (see 6.4). The samples shall be
plainly identified by securely attaching durable tags containing the
following information:
Samples submitted by (name and date) for qualification?
inspection in accordance with the requirements Of
MIL-R-25410G and test number under authorization
(reference authorizing letter see 6.4).
4.3.2 Retention of Qualtfied Products Listing (QPL). The retention
of qualification listinqs shall consist of verification every two years to
determine compliance of the listed item with the requirements of this
specification. Verification shall be by manufacturer's certification
unless otherwise specified by the activity responsible for the QPL.
4.4 First article inspection. First article inspection shall
consist of the tests and examinations. specified in Table VI, listed sequence
mandatory. If there is no Qualifictions Products Listing for the regulator being
procured, first article testing shall consist of the tests specified in
Table V.
4.4.1 First article samples.
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business