MIL-DTL-19803G
5.
PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified
in the contract or order (see 6.2). When packaging of materiel is to be performed by DoD or in-
house contractor personnel, these personnel need to contact the responsible packaging activity to
ascertain packaging requirements. Packaging requirements are maintained by the Inventory
Control Point's packaging activities within the Military Service or Defense Agency, or within the
military service's system commands. Packaging data retrieval is available from the managing
Military Department's or Defense Agency's automated packaging files, CD-ROM products, or
by contacting the responsible packaging activity.
6.
NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is
not mandatory.)
6.1 Intended use. The converter covered by this specification is intended to be used in
military aircraft liquid oxygen systems for storing and pressurizing liquid oxygen for subsequent
conversion to the gaseous phase as required for aircrewman breathing during flight.
6.2. Acquisition requirements. Acquisition documents should specify the following:
a. Title, number and date of this specification, including any amendments.
b. When first article is required (see 3.2).
c. Name and address of the first article inspection laboratory (see 4.3.1) and the name of the
Government activity responsible for conducting the first article inspection program (see 4.3.1.1).
d. The contractor shall submit verifiable evidence that the converter system is free from any
objectionable odor, toxic gases or by-products (see 3.10).
e. Marking requirements (see 3.11.2).
f. Packaging requirements (see 5.1).
6.3 Qualification. With respect to products requiring qualification, awards will be made
only for products which are, at the time of award of contract, qualified for inclusion in Qualified
Products List, QPL-19803, whether or not such products have actually been so listed by that date.
The attention of the contractors is called to these requirements, and manufacturers are urged to
arrange to have the products that they propose to offer to the Federal Government tested for
qualification in order that they may be eligible to be awarded contracts or orders for the products
covered by this specification. Information pertaining to qualification of products may be
21
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business