MIL-DTL-19246E
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are
classified as follows:
a. Qualification inspection (see 4.2).
b. First article inspection (see 4.3).
c. Conformance inspection (see 4.4).
4.2 Qualification inspection. Qualification inspection shall consist of the following
examinations and tests:
Visual examination
Dimensions
Disconnection force
Leakage (room temperature)
Relief valve setting
Pressure drop through MC-3A connector
Pressure drop through MC-3A connector with MS22058 connector
Proof pressure
Bailout flow
Drop test
4.3 First article inspection. First article inspection shall consist of the following
examinations and tests:
Visual examination
Dimensions
Disconnection force
Leakage (room temperature)
Relief valve setting
Pressure drop through MC-3A connector
Pressure drop through MC-3A connector with MS22058 connector
Proof pressure
Bailout flow
Drop test
4.3.1 First article samples. After the award of the contract or order, the manufacturer shall
submit three connector assemblies. The samples shall be representative of the construction,
workmanship, components, and materials to be used during production. When a contractor is in
continuous production of these connector assemblies from contract to contract, submission of
6
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business