MIL-R-85523A(AS)
• Sample submitted by (name), (date) for qualification inspection in accordance with the requirements of MIL-R-85523A(AS)
• Number under authorization (reference authorizing letter and number) (see 6.4).
4.3.2 Retention of qualification. The retention of qualification shall consist of periodic verification to determine compliance of the qualified regulator with the requirements of this specification. The time and method of periodic verification shall be specified by the activity responsible for the Qualified Products List and shall be included in the Notice of Qualification letter.
4.4 First article inspection. First article inspection shall be as specified in Table VIII, in the order specified.
4.4.1 First article samples. Unless otherwise specified, as soon as practicable, after award of the contract or purchase order, the manufacturer shall submit four complete regulators and three elastomer slabs. The elastomer
slabs shall be 6 by 6 by 0.075 inch and composed of the identical ozone resistant composition and cure that was used in manufacturing the elastomer components.
The samples shall be representative of the construction, workmanship, components and materials to be used during production. When a manufacturer is in continuous production of these units from contract to contract, submission of further first article samples on a new contract may be waived at the discretion of the acquisition activity (see 6.2d). Approval of the first article samples or the waiving of the first article inspection does not waive the requirements of submitting to the quality conformance inspection. The first article inspection samples shall be furnished to the Government as directed by the contracting officer (see 6.2e).
4.4.2 First article information. Upon completion of the first article inspection, all the applicable inspection reports, recommendations and pertinent comments will be forwarded by the Government activity responsible for the inspection program (see 6.2e) to the contracting activity. Disposition of samples shall be as follows:
a. One approved sample will be initially returned to the contractor for use in monitoring production.
b. One approved sample will be retained by the test facility for reference during quality conformance verification and shall be returned to the contractor with samples from the final production lot.
c. The remaining samples will be consumed or destroyed during the inspection program and shall not be considered as part of the quantity to be delivered under the acquisition document.
4.5 Quality conformance inspection. The sampling and inspection levels and the acceptance criteria shall conform to MIL-STD-105 and Table I. Quality conformance inspection shall be as specified in Table I, in the order specified.
4.5.1 Sampling.
4.5.1.1 Inspection lot.
10